Calibration of single phase energy meter by phantom loading

AIM:

To calibrate the given single phase wattmeter by phantom loading at UPF and at 0.5pf.

APPARATUS REQUIRED:

  • Voltmeter
  • Ammeter
  • Wattmeter
  • Lamp load 
  • Energy meter

THEORY

When current rating of the meter under test is high, a test with actual loading arrangements involves considerable waste of power. Phantom loading consists of supplying the pressure circuit with required normal voltage and the current circuit from a low voltage supply. the total power required for testing the meter with phantom loading is comparatively very small.

PROCEDURE:

At UPF 

  • Connections are made as shown in diagram 
  • The rated voltage applied across pressure coil 
  • Keep the autotransformer at its minimum position and switch on the power supply. 
  • Adjust the autotransformer for various values of current from minimum to maximum 
  • Take all meter readings and time taken for 5revolution of E/M disc 
  • Plot error and calibration curve 

At 0.5pf lag 

  • Connect the pressure coil across N&Y and CC in R phase 
  • Repeat the same procedure mentioned above 
  • Plot the error and calibration curve

CIRCUIT DIAGRAM:

OBSERVATION:

PFv/mA/mTime for 5 rev of E/M discRecorded power = (5/t)*(3600/N) KWHActual power( VI cosΦ/1000)Error = RP-AP% Error = (RP-AP)/RP
UPF
0.5 LAG

RESULT:

The given single phase energy meter is calibrated at UPF and 0.5 lag by phantom loading

You may also like...

error: Content is protected !!