Category: Lab Manuals

EEE Lab Manuals

Three phase power measurement using one wattmeter method

AIM: To measure the 3-phase reactive power by one – wattmeter method for inductive load. APPARATUS REQUIRED: SinglePhaseWattmeter, Three Phase inductive load. THEORY: Three phase reactive power can be measured by two wattmeter method...

Verification of thevenin’s theorem in dc circuits

AIM: To verify Thevenin’s theorem and to find the full load current for the given circuit APPARATUS REQUIRED: RPS (regulated power supply) (0-30V)  – Quantity 2  Ammeter (0-10mA)  330Ω 1k Resistors   Bread Board —...

Verification of super position theorem in dc circuits

AIM: To verify the superposition theorem for the given circuit. APPARATUS REQUIRED: RPS (regulated power supply) (0-30V)  – Quantity 2  Ammeter (0-10mA)  220Ω, 330Ω 1k Resistors   Bread Board — — 5. Wires — Required...

error: Content is protected !!