Electrical Workshop Practice Lab Manual

EXPERIMENT NO: 1

WIRING OF SIMPLE LIGHT CIRCUIT FOR CONTROLLING LIGHT/FAN POINT

Aim

       To wire up a circuit with one lamp controlled by one switch in surface conduit system of

wiring as per given layout and check the conditions.Also Prepare the estimation.

              CONDITIONS

           S1↑  L1 Dark

           S1↓  L1 Bright  

Tools required

Screwdriver, line tester, cutting plier, wire stripper, hammer, hacksaw, poker

Estimation

Sl.NoName of MaterialSpecificationQuantityUnit
1PVC Conduit20 mm  
2PVC insulated Copper wire1 mm2, , 1100 V grade  
3Flush Type SPST Switch6A, 240 V  
4Switch box(Gang Box)75×50×25 mm  
5Steady batten lamp holder6 A, 250 V  
6Incandescent Bulb60 W, 240 V  
7Saddle clips20 mm  
8PVC Round block75 X 25 mm  
93 way Junction box20 mm  
10Neutral Link6 A, 240 V  
11Kitkat type fuse unit6 A, 240 V  
12Screws13×4mm  
16×8mm  
30×8mm  
   
   
   

Procedure

  • Cut the Conduits in the required length (20cm) using Hack saw.
  • Fix the conduits ,junction box ,switch box in required positions as per the lay out using saddles and screws.
  • Run the wire through conduits, as per the given circuit diagram & then fix the Round block,switches,holder in required positions using screws.
  • Check the circuit before applying the supply
  • Give the single phase supply through a fuse and neutral link
  • Check the conditions

     LAY OUT

 CIRCUIT DIAGRAM

Result:

EXPERIMENT NO: 2

WIRING OF LIGHT/FAN CIRCUIT USING TWO WAY SWITCHES (STAIRCASE WIRING)

Aim

       To wire up a circuit with one lamp controlled simultaneously from 2 places as per the given

layout diagram in surface conduit system of wiring & check the conditions .Also Prepare the Estimation to finish the work.

             CONDITIONS

                     S1↑ S2↑ L Bright

                     S1↑ S2↓ L Dark

                     S1↓ S2↑ L Dark

                     S1↓ S2↓ L Bright

Tools Required:

       Screw driver, line tester, pocker ,hammer, wire stripper, plier,  Hack saw.

Estimation

Sl.NoName of MaterialSpecificationQuantityUnit
1PVC Conduit20 mm  
2PVC insulated Copper wire1 mm2, , 1100 V grade  
3Flush Type SPST Switch6A, 240 V  
4Switch box(Gang Box)75×50×25 mm  
5Steady batten lamp holder6 A, 250 V  
6Incandescent Bulb60 W, 240 V  
7Saddle clips20 mm  
8PVC Round block75 X 25 mm  
93 way Junction box20 mm  
10Neutral Link6 A, 240 V  
11Kitkat type fuse unit    6 A, 240 V  
12Screws13×4mm  
16×8mm  
30×8mm  
   
   
   

Procedure :

  • Cut the Conduits in the required length (20cm) using Hack saw.
  • Fix the conduits ,junction box ,switch box in required positions as per the lay out using saddles and screws.
  • Run the wire through conduits, as per the given circuit diagram & then fix the Round block,switches,holder in required positions using screws.
  • Check the circuit before applying the supply
  • Give the single phase supply through a fuse and neutral link
  • Check the conditions

Result :

Layout

Circuit Diagram

RESULT

EXPERIMENT NO: 3

WIRING OF FLUORESCENT LAMPS AND LIGHT SOCKETS

Aim

       To wire up a flouroscent lamp with a choke and starter connected by a switch in PVC conduit system of wiring. Also prepare the estimation.

Tools

       Hammer, Screw driver, wire stripper, line tester, pocker, and knife

Estimation

Procedure

  • Cut the conduits in the required length using Hacksaw.Then fix the conduit, junction box, switch box in required positions as per layout.
  • Run the wire through the conduit as per the given circuit diagram and then fix the round block.
  • Connect the phase from ceiling rose to ballast and other end of the ballast is connected to the tube electrode. Glow type starter is connected.
  • Check the circuit before applying the supply.

Result:

EXPERIMENT NO: 4

WIRING OF POWER CIRCUIT FOR CONTROLLING POWER DEVICES

Aim

       To wire up a circuit with one lamp controlled by one switch with addition of plug point in surface conduit system of wiring as per the given layout & check the conditions.Also prepare the estimation.

CONDITIONS

           S1↑ S2↑   L1 Dark   P Off

           S1↓ S2↓    L1 Bright  P On

Tools required

Screw driver, line tester, cutting plier, stripper, hammer, hack saw, pocker

Estimation

Sl.NoName of MaterialSpecificationQuantityUnit
1PVC Conduit20 mm  
2PVC insulated Copper wire1 mm2, , 1100 V grade  
3Flush Type SPST Switch6A, 240 V  
4Switch box(Gang Box)75×50×25 mm  
5Steady batten lamp holder6 A, 250 V  
6Incandescent Bulb60 W, 240 V  
7Saddle clips20 mm  
8PVC Round block75 X 25 mm  
94 way Junction box20 mm  
10Neutral Link6 A, 240 V  
11Kitkat type fuse unit      6 A, 240 V  
12Screws13×4mm  
13 16×8mm  
14 30×8mm  
15 16Bend          20mm  
3 pin plug point6A,240 V  
   
   
   
   

Procedure

  • Cut the Conduits in the required length (20cm) using Hack saw.
  • Fix the conduits ,junction box ,switch box in required positions as per the lay out using saddles and screws.
  • Run the wire through conduits, as per the given circuit diagram & then fix the Round block,switches,holder in required positions using screws.
  • Check the circuit before applying the supply
  • Give the single phase supply through a fuse and neutral link
  • Check the conditions

Layout

Result :

EXPERIMENT NO: 5

GODOWN WIRING

Aim

       To wire up a circuit with three lamps controlled by three switches in surface conduit system of wiring as per the given layout & check the conditions .Also Prepare the Estimation to finish the work.

                   CONDITIONS

       S1   S2   S3         L1        L2        L3

       ↑     ↑     ↑           OFF       OFF    OFF

       ↓     ↑     ↑           ON        OFF     OFF

       ↓     ↓     ↑           OFF       ON     OFF

       ↓     ↓     ↓            OFF      OFF    ON

Tools

       Screw driver, line tester, poker ,hammer, wire stripper, plier, Hack saw.

Estimation

Sl.NoName of MaterialSpecificationQuantityUnit
1PVC Conduit20 mm  
2PVC insulated Copper wire1 mm2, , 1100 V grade  
3Flush Type SPST Switch6A, 240 V  
4Switch box(Gang Box)75×50×25 mm  
5Steady batten lamp holder6 A, 250 V  
6Incandescent Bulb60 W, 240 V  
7Saddle clips20 mm  
8PVC Round block75 X 25 mm  
93 way Junction box20 mm  
10Neutral Link6 A, 240 V  
11Kitkat type fuse unit6 A, 240 V  
12Screws13×4mm  
  16×8mm  
13Flush Type SPDT Switch30×8mm  
   
6A, 240 V  
   
   
   

Procedure:

  • Cut the Conduits in the required length (20cm) using Hack saw.
  • Fix the conduits ,junction box ,switch box in required positions as per the lay out using saddles and screws.
  • Run the wire through conduits, as per the given circuit diagram & then fix the Round block,switches,holder in required positions using screws.
  • Check the circuit before applying the supply
  • Give the single phase supply through a fuse and neutral link
  • Check the conditions

LAYOUT

                          CIRCUIT DIAGRAM

Result :

EXPERIMENT NO: 7

WIRING OF POWER DISTRIBUTION ARRANGEMENT USING SINGLE PHASE MCB, DISTRIBUTION BOARD WITH ELCB, MAIN SWITCH AND ENERGY METER

Aim

       To design and wire up the circuit of main board and a consumer board having ELCB and MCB for a bed room having one light point. Work is to be done in PVC conduit system as per the

given layout and prepare suitable estimation

Tools required

       Pocker, hammer, screw driver, wire stripper, plier, hack saw, and line tester

Materials required

Procedure

  1. The components are laid on the board and arrange according to the connection diagram
  2. The whole arrangement is centralised
  3. Draw wire through the pipes and connection are made in main board and consumer board
  4. Neutral and phase wire are connected and connections are taken to sub-circuit

         CIRCUIT DIAGRAM

Result